Project: Concrete Breakwater @ South Bay Boat Yard
Owner: City of Oceanside
Start date: 8/1/1987
Finish date: 9/16/1988
Value: $785,772

This project involved the installation of pile supported caps and precast concrete breakwater panels to create a protected marina and boat yard with new Travel Lift piers. Additionally, a new sheetpile bulkhead was installed on the eastern side of the yard for the boatyard's shoreside expansion. Bellingham Marine floating docks were installed inside the breakwater to stage boat repairs. Miscellaneous utilities were installed on the docks.

<  Back to Marine Construction Projects

Office 619-276-4401         FAX 619-276-0717         10108 Riverford Road, Lakeside, CA 92040
Copyright © 2009 Marathon Construction Corporation, All Rights Reserved
CONTRACTORS AND ENGINEERS
CA License No. 411338 A, B