|
Project Profiles Industrial/Commercial Environmental Mitigation/ Contract List
|
Project Detail
Project: Oceanside Harbor Dock Replacement This project involved the removal, disposal, and replacement of 16 dock systems in the Oceanside Marina. The replacement floating docks were provided by Bellingham Marine. Headwalk length varied, but average about 500 feet in length and slip lengths ranged 20 feet to 60 feet. Each dock system had to be independently demolished and replaced before another dock system could be worked on. This was challenging and timing was critical on this project due to the small amount of vacant slips to temporarily moor the boats to.
|
CA License No. 411338 A, B